Customer

EC Throsby and Hilltop Meats are a large family-ownedAustralian beef processing company with over 70 years of industry experience, specialising in both domestic and international markets.​

Energy Specialties steam system upgrade case study overview
Previously the plant relied on 25 instantaneous gas hot water units to make. plant hot water. They constantly broke down , needed maintenance and struggled to meet the plant demand​

The Need

The Abattoir and Rendering Facility at Young requires a large amount of hot water ( about 45,000 lts/hr) , which is critical tot he process. The existing system was unreliable, restricted output, expensive to run and inefficient. Unreliable hot water, meant production stoppages at a cost of thousands of dollars a minute​.

The Engineered Solution

To engage Energy Specialties to review the existing requirements and plan for future demands .Design, build supply , install and commission a new heat exchange hot water solution. Offer a turnkey solution that would give the business reliable hot water, produced efficiently​.

The heat exchange unit had multiple functionality and safety features included-​Pressure reduction so the steam supply temperature is always lower thanthe water pressure – eliminating high temperature flashing – which is asafety issue.​Overheat lock out valves​Recirculating modulating valves back to the hot water tank – control so thatthe production water would be unaffected by flow /pressure fluctuations.

Industrial steam condensate system before and after upgrade

The Result

A bespoke , compact heat exchange unit capable of producing60,000 lts/hr , instantaneously heating water from 15C to 90C.The bespoke heat exchange unit , now has the capacity to fulfill the hot water demands under any production conditions. Hot water to plant now guaranteed. Efficient hot water production.

Steam system efficiency report showing gas usage reduction